Points to note when connecting Power Current Transformers in series
Jun 22, 2022| The wiring of the Power Current Transformer should follow the basic principle of series connection: the primary winding should be connected in series with the power supply circuit under test, and the secondary winding should be connected in series with the loads of all instruments and equipment. Choose a moderate variation based on the amount of current that needs to be measured correctly. Otherwise, the bias will rise. In addition, the secondary coil side must be grounded to avoid damage to the insulating layer when the intermediate side is pressed into the bottom pressure side of the secondary coil, causing personal safety and mechanical equipment safety accidents.
The secondary coil side is not allowed to be cut off. When the Power Current Transformer works normally, the secondary coil side is similar to a short circuit fault. If it is suddenly opened, the induced electromotive force of the magnetic regulator is encouraged to suddenly change from a small value to a large value, and the magnetic flux of the transformer core shows a sloping roof in a relatively saturated state. Therefore, when the magnetic flux exceeds zero, the secondary winding will generate a high top wave, the value of which can reach thousands of volts or even tens of volts, which is very harmful to the safety of emergency handlers and the insulation performance of instruments and equipment.
In addition, the lead circuit on the secondary coil side will bring more than 100 volts of working voltage to E2, and a safety accident will occur if it is touched. Therefore, a short-circuit fault power switch is set on the secondary coil side of the Power Current Transformer to prevent the secondary side from being broken. In the whole process of application, once the side of the secondary coil is broken, the load of the power supply circuit should be removed immediately, and then terminated. Once everything is resolved, it can be aggravated.
When installing the Defensive Power Current Transformer, try to remove maintenance of the protective equipment as much as possible. set region. Such as two sets of Power Current Transformers, when the location allows, please place them on both sides of the isolation switch, so that the isolation switch is within the scope of cross maintenance.
In order to better alleviate the harm of common faults inside the generator set, the Power Current Transformer, which automatically adjusts the excitation regulator equipment, must be installed on the output side of the generator rotor winding. In order to better analyze the common faults found in the generator set before entering the system software, please set the Power Current Transformer of the detection device on the neutral line of the generator set.