Power Current Transformer Explosion Precautions

May 13, 2022|

(1) Check whether the lead connector in the primary terminal of the transformer is in good contact

The primary terminal lead joint of the Power Current Transformer should be in good contact and the contact area should be kept enough to prevent the Power Current Transformer from overheating. The L2 terminal and the expander cover should be connected to the equipotential to prevent the potential from floating. In addition, there should be anti-rotation measures for the secondary wire lead-out crucible to prevent the internal lead from being twisted and broken due to external operation.

(2) The cause of abnormal test value should be identified

When the dielectric loss factor tg value measured before and during operation is abnormal, comprehensive analysis should be made for the obvious change of tgδ and temperature, or the test voltage rises from 10kv to Um/root 3, and the increment of tgδ exceeds ±0.3%, the operation should be stopped. . When the chromatographic analysis results are abnormal, the comprehensive analysis should be followed to investigate the growth trend. If the data grows rapidly, attention should be paid. Nip accidents in the bud.

(3) Keep the busbar differential protection normally put into operation

In order to avoid expanding the scope of the accident when a breakdown accident occurs at the bottom of the capacitor core of the Power Current Transformer, attention should be paid to the correct installation direction of the primary terminal L1 and L2 and the polarity connection of the secondary winding to ensure the normal operation of the bus differential protection. run

(4) Check the short-circuit current

According to the development of the power grid, pay attention to check and calculate the short-circuit current of the location where the Power Current Transformer is located, and arrange for replacement in time when it exceeds the dynamic thermal stable current value on the transformer nameplate.

(5) On-line monitoring and infrared temperature measurement of built-up boards

At present, the online monitoring projects carried out by Power Current Transformer mainly include: measuring the capacitance and dielectric loss factor tgδ of the main insulation, and measuring the insulation resistance and dielectric loss factor tgδ of the end screen insulation. Test experience has shown that it is effective in detecting insulation defects. For infrared temperature measurement, some units have already carried out. The existing test results show that it is effective in detecting the looseness of the internal joint of the Power Current Transformer, but experience is still needed.