Common Mistakes in Current Transformer Installation
Jun 03, 2026| I. Secondary Side Open Circuit (Most Dangerous)
Incorrect Manifestations: Installing switches or fuses on the secondary circuit, or loose wiring leading to an open circuit during operation.
Consequences:
Generates thousands of volts of high voltage, endangering personnel and equipment safety;
Severely saturates the iron core, causing overheating and burning out the coil;
Measuring instruments show no indication, and protection devices fail to operate.
Correct Practice: Switches are strictly prohibited from being installed on the secondary circuit. Wiring must be secure. Before maintenance, short-circuit terminals S1-S2.
II. Reversed Polarity and Direction
Incorrect Manifestations:
Primary side P1 is not facing the power supply side; P2 is reversed;
Secondary side S1 and S2 wiring is reversed.
Consequences:
Energy meter reverses direction or undercounts by 2/3;
Differential protection trips falsely due to abnormal differential current;
Power factor display is abnormal.
Correct Procedure: P1 must face the power supply side, S1 connected to the instrument's positive terminal, S2 grounded. Polarity must be verified using a DC method or testing instrument.
III. Incorrect Grounding Method
Incorrect Manifestations: S2 terminal not grounded or unreliable grounding; Multiple grounding points create circulating current, interfering with protection devices.
Consequences: High voltage enters the secondary circuit, causing equipment damage; Protection devices malfunction or fail to operate, affecting system stability.
Correct Procedure: S2 terminal should be reliably grounded at one point, connected to a dedicated grounding copper busbar, not connected to the cabinet bolts.
IV. Improper Primary Side Installation
Incorrect Manifestations: Through-core conductor eccentric, tilted, or not centered; Three-phase asymmetry when multiple cables pass through the core; Open-type CT not securely closed.
Consequences: Magnetic circuit asymmetry, increased measurement error; Inaccurate zero-sequence current detection; Degraded performance, increased heat generation.
Correct Procedure: Conductors should pass vertically and centered, with symmetrical three-phase arrangement. Open-type CTs must be securely fastened after installation.
V. Turns Ratio Mismatch with Load
Incorrect Symptoms: Turns ratio selected too high or too low; operating current outside the 60%~120% rated range; too many instruments connected to the secondary side, total impedance exceeding limits.
Consequences: Decreased metering accuracy; CT saturation, output distortion.
Correct Practice: Select an appropriate turns ratio based on the actual load, ensuring the secondary load is within its rated capacity.