What should be paid attention to when short-circuiting the secondary winding of the Power Current Transformer?

Dec 02, 2024|

1. Preparation before operation
Tool selection: Tools that meet insulation requirements must be used, such as well-insulated wires, short-circuit pieces, insulated screwdrivers, etc., to prevent electric shock accidents or short-circuit faults caused by conductive tools during short-circuiting.
Personal protection: Operators should wear personal protective equipment such as insulating gloves and insulating shoes to ensure their own safety and avoid high voltage injuries caused by misoperation.
Understand the status of the equipment: Before short-circuiting, you must fully understand the operating status of the Power Current Transformer, the wiring of the secondary circuit, and the working conditions of related equipment, clarify the purpose and operation steps of short-circuiting, and avoid blind operation causing other problems.
2. Short-circuit operation process
Short-circuit position: Short-circuit should be performed at the outlet terminal of the secondary winding of the Power Current Transformer to ensure the reliability of the short-circuit. Generally, the S1 and S2 terminals of the secondary winding are directly short-circuited with short-circuit pieces or wires to form a closed circuit, so that the secondary current can flow through the short-circuit circuit.
Short-circuit sequence: If the Power Current Transformer has multiple secondary windings, when short-circuiting is required, the operation should be carried out in the order of stopping first and then short-circuiting. That is, first stop the operation of the protection device, measuring instrument and other equipment related to the secondary winding, and then perform the short-circuit operation to prevent the current shock generated during the short-circuit process from damaging the equipment.
Operation skills: During the short-circuit process, ensure that the short-circuit tool is in good contact with the terminal to avoid arcing due to poor contact. The operation should be smooth and accurate to prevent the terminal from loosening or being damaged due to excessive force. If a short-circuit piece is used for short-circuiting, ensure that the clamping force of the short-circuit piece is moderate, which can ensure good electrical connection without damaging the terminal.
3. Inspection after short-circuiting
Circuit inspection: After the short-circuit is completed, the short-circuit circuit should be checked to ensure the integrity and reliability of the short-circuit. Check whether the short-circuit wire is firmly connected, whether there is any looseness or breakage, whether the short-circuit piece is clamped, and whether there is a risk of short-circuiting other circuits.
Equipment status check: At the same time, check the status of the equipment connected to the secondary winding of the Power Current Transformer, such as whether the measuring instrument is zeroed, whether the protection device has abnormal alarms, etc. If the equipment status is abnormal, the cause should be found and handled in time to prevent other faults caused by short-circuit operation.
4. Restore operation
When the fault is handled or the normal operation of the Power Current Transformer needs to be restored, the operation should be carried out in the order of removing the short circuit first and then restoring the equipment operation. When removing the short circuit, be careful to avoid causing the secondary circuit to open again due to improper operation. After removing the short circuit, conduct a comprehensive inspection of the equipment to ensure that the equipment is operating normally, the measuring instrument and protection device are working properly, and the secondary current display of the Power Current Transformer is accurate.