What special installation scenarios are suitable for open-type current transformers?
Jul 29, 2026| 1. Uninterrupted Power Supply Upgrade Scenarios: Upgrading power distribution systems in old residential areas, industrial/rural power grids, and production lines in semiconductor manufacturing and other sectors where continuous operation is impossible, eliminates the need for prolonged power outages, significantly reducing the impact on residential electricity consumption and business production.
2. Space-Constrained Scenarios: In narrow spaces with densely packed busbars and no pre-reserved installation locations, installation can be completed directly onto the busbars or cables without dismantling existing cables.
3. High-Voltage Overhead Line Scenarios: Current monitoring and reactive power compensation control for 10kV and below medium-voltage overhead lines can be performed without cutting conductors; installation can be completed by certified professionals working under energized conditions.
4. Temporary Monitoring and Maintenance Scenarios: Temporary load testing, fault diagnosis, and line upgrades using monitoring equipment are all possible. The equipment can be quickly disassembled and reused, significantly reducing maintenance costs.
5. Special Operating Condition Adaptation Scenarios: In scenarios where power supply cannot be interrupted, such as data centers and continuously operating industrial and mining enterprises, current monitoring equipment can be installed without affecting normal power consumption.