Matters needing attention in the operation of current transformer
Aug 17, 2022| In the route of power supply and consumption, the current and voltage vary greatly from a few amps to more than 100,000 amps. In order to facilitate the accurate measurement of the secondary instrument panel, it must be converted into a relatively uniform current. In addition, the working voltage on the route is relatively high, such as immediate and accurate measurement is very risky. Current transformers have the functions of current transformer and electrical equipment protection, and there are common problems in the operation of current transformers.
The secondary side of the current transformer cannot be opened during operation. Once the secondary side is opened, it will be damaged due to excessive iron loss and high temperature, or the working voltage of the secondary winding will rise and the insulating layer will be thermally broken down, resulting in high-voltage electric shock. risk of accident. Therefore, when replacing the instrument panel, such as replacing the ammeter, active power meter, reactive power meter, etc., the current loop should be short-circuited before the replacement of the metering and verification instrument panel. When the meter is adjusted, first connect it to the secondary circuit, then remove the shorting wire and check whether the meter is normal. If a flame is found when removing the short-circuit wire, the current transformer has been opened, and it should be short-circuited again first, and the short-circuit wire can be removed again only when it is checked that there is no open circuit in the circuit of the meter. When carrying out the work of disassembling the short circuit of the current transformer, it should stand on the insulating layer leather pad. In addition, it is necessary to consider that the protector of the current transformer circuit should be stopped. After the work is completed, the protector funds can be put into operation.
When the grounding resistance of the electromagnetic coil on the secondary side of the current transformer is less than 10~20 megohms, it is necessary to carry out a dry solution, so that the insulation layer can be repaired before it can be used.
One end of the secondary side of the current transformer and the casing must be grounded reliably. If there is a buzzing sound in the current transformer, it should be checked whether the inner iron core is loose, and the anchor bolts of the iron core can be tightened.