Use of current transformers

Jun 12, 2023|

 

1) The wiring of the current transformer should follow the series principle: that is, the primary winding should be connected in series with the circuit under test, while the secondary winding should be connected in series with all instrument loads

2) Select the appropriate change according to the magnitude of the measured current, otherwise the error will increase. At the same time, one end of the secondary side must be grounded to prevent the high voltage on the primary side from entering the low voltage side of the secondary side once the insulation is damaged, causing personal and equipment accidents

3) The secondary side is absolutely not allowed to open. Once the circuit is opened, the primary side current I1 becomes the magnetizing current, causing a sudden increase in φm and E2, resulting in over-saturation and magnetization of the iron core, serious heating and even burning of the coil; at the same time, the over-saturation and magnetization of the magnetic circuit increases the error. When the current transformer is working normally, the secondary side is approximately short-circuited. If it is suddenly opened, the excitation electromotive force suddenly changes from a small value to a large value, and the magnetic flux in the iron core presents a severely saturated flat top. Wave, so the secondary side winding will induce a high peak wave when the magnetic field passes through zero, and its value can reach thousands or even tens of thousands of volts, endangering the safety of workers and the insulation performance of the instrument.

In addition, the open circuit of the primary side causes the voltage of the secondary side to reach hundreds of volts, which will cause electric shock accidents once touched. Therefore, the secondary side of the current transformer is equipped with a short-circuit switch to prevent the primary side from being open. During use, once the secondary side is open, the circuit load should be removed immediately, and then stop the machine. It can be reused after everything is processed.

4) In order to meet the needs of measuring instruments, relay protection, circuit breaker failure judgment and fault filtering, etc., install 2 to 8 current transformers with secondary windings. For large-current grounding systems, it is generally configured as three-phase; for small-current grounding systems, it is configured as two-phase or three-phase according to specific requirements

5) The installation location of the protective current transformer should be set to eliminate the unprotected area of the main protective device as much as possible. For example: if there are two sets of current transformers, and the location permits, they should be installed on both sides of the circuit breaker, so that the circuit breaker is in the cross protection range

6) In order to prevent the bus fault caused by the flashover of the bushing of the pillar current transformer, the current transformer is usually arranged on the outgoing line of the circuit breaker or on the side of the transformer

7) In order to reduce the damage caused by the internal failure of the generator, the current transformer used to automatically adjust the excitation device should be arranged on the outlet side of the generator stator winding. In order to facilitate analysis and find internal faults before the generator is integrated into the system, the current transformer used for measuring instruments should be installed on the neutral point side of the generator.